Thursday, October 17, 2013

The Paving Project: day 4

Work continues, although there will be a break for the weekend. It's going to be cool next week, and although I would like some rain for the garden, I don't want to see the weather slowing down the paving. The left-hand passageway has taken a little longer than expected, because the posts on the fence face our way, and that has required lots of trimming of pavers to fit. The other side shouldn't take quite as long.

The pallet was piled high. It looks as if
about half of the pavers have been placed.

The passageway is looking trim and neat.
Once the drains are cut off, we'll be able to
walk down here even in the heaviest storms.

I'm seriously impressed with the attention
to detail on this job. The other person who
quoted (twice the price) was planning to fill
in that narrow space with sand - not the tiny
little piece, all the pieces that aren't whole pavers.

Another example of the attention to detail.

Looking back towards the front of the house.
All in all, I'm very happy with the quality of work on this job so far.