I think we must be about half-way there ... the front door has been installed, and the Weathertex is in place. There are only a couple of photos from this week's visit, as I could only hobble about the site briefly ...

The usual photograph take from across the street.
Note the front door.
(And no, bilious green is not the final colour).

The brick wall for the left hand side of the garage,
required for fire prevention purposes.


There is still a little work to be done on the outside
fabric of the house, including the cladding
on the lobby. This will be the same Wethertex
as can be seen on above the sliding
door at the front of the house.
When I drove past this morning, someone was fitting the solar panels for the hot water system, I think. There was a structure on the roof, anyway.